Home / Blogs
Blogs
02/ 10/ 2026

Shipbuilding — BetrueTech Intelligent Welding Solution

The shipbuilding industry faces many challenges, such as Excess Orders, Insufficient Capacities, Under-Automated:Low Production Efficiency• Inconsistent welding performance — quality affected by environmental conditions.• Inefficient for small batches & multiple variants — manual robot

More >>
Shipbuilding — BetrueTech Intelligent Welding Solution.jpg
09/ 24/ 2025

Hubei Citian Intelligent Transmission Co., Ltd

Tieliu Automotive Transmission System Components Industrial Park

More >>
1湖北慈田智能传动有限公司.png
09/ 24/ 2025

Dajian Interchange at Jiuhua South Road, Anhui

Steel Box GirderSpan: 3×56.5mCompletion year: 2021

More >>
图片2_1.jpg
09/ 24/ 2025

Hangzhou Land Reserve [2021] No. 46 Plot Residential Building

Hangzhou Land Reserve [2021] No. 46 Plot Residential Building (with Sup-porting Public Facilities). This residential building is located in Gongshu Dis-trict, Hangzhou, east of Lishui Road, south of Jiangjiaqiao Road, and west of Guyang Road. Building 5's main structure uses a steel frame-steel plat

More >>
主图.jpg
09/ 24/ 2025

The Xinchang Citizen Park project

The Xinchang Citizen Park project is located in Xinchang County, Shaoxing City. The steel structure mainly consists of two parts: the theater steel structure beam and the urban balcony dome structure. The main beam of the theater has a span of 45 meters and weighs about 35 tons, which is lifted by a

More >>
主图.png
09/ 24/ 2025

Wenskai Technology Building Project

Wenskai Technology Building Project is located in Huangpu District, Shanghai, bordered by Guangxi North Road to the east, Guizhou Road to the west, Zhifu Road to the south, and Beijing East Road to the north, this projectprimarily serves commercial and office purposes. The main building has 16floors

More >>
主图.jpg
09/ 24/ 2025

Niutian Unit G11/C3/C4-01 Plot Park and Cultural Sports Center Project

Niutian Unit G11/C3/C4-01 Plot Park and Cultural Sports Center Project.This design includes a scenic pedestrian bridge within the park, consisting of amain bridge and a ramp bridge. The main bridge has a total length of 600.524meters and a width of 4.1 meters. The ramp bridge is 40 meters long and 2

More >>
主图.png
09/ 24/ 2025

Bridge BR - 06L/R on the Northern Expressway in Tehran, Iran

Cantilever Form TravelerSpan: 83 + 153 + 83 = 319mCompletion Year: 2016At the time, the largest corrugated steel web girder bridge in the Middle East, with a span of 153 meters

More >>
主图.jpg
09/ 24/ 2025

Terminal of Chaoshui Airport in Yantai, Shandong

Hoisting constructionSpan: 100mCompletion year: 2013

More >>
主图.jpg
09/ 24/ 2025

Zhouchenghe Bridge, Lining Expressway, Jiangsu, China

Hoisting InstallationU-shaped girder + Steel towerCompletion: 2022

More >>
主图.jpg
09/ 24/ 2025

Shanghai Lanhai Southwest Orthopedic Hospital New Construction Proj- ect

Shanghai Lanhai Southwest Orthopedic Hospital New Construction Proj-ect is located in Huacao Town, Minhang District, Shanghai New Hongqiao International Medical Center, plot 33-09, covering a total area of 35,181 square meters and a building area of 99,625 square meters. The building is en-tirely st

More >>
主图.jpg
09/ 24/ 2025

Hangzhou Land Reserve [2019] No. 27 Plot Commercial and Residential Complex

Hangzhou Land Reserve [2019] No. 27 Plot Commercial and ResidentialComplex with Underground Public Parking Project (Hangzhou JianghehuiEast District Tentative Name) Phase II is located in Qianjiang New City,Hangzhou, this project includes four main buildings and a podium. The mainbuildings have 21 f

More >>
主图.png
09/ 24/ 2025

Keqiao Future Medical Center Project

Keqiao Future Medical Center Project is located in Huashi Street, Keqiao City,north of Creative Road, south of Shangfang Mountain Avenue, east of Yucai Road,and west of Kechuang Road, this project covers a total area of 235,793 squaremeters and a total building area of 500,000 square meters. It is a

More >>
主图.jpg
09/ 24/ 2025

Xiaoshan Land Reserve [2021] No. 33 Plot Phase II

Xiaoshan Land Reserve [2021] No. 33 Plot Phase II (XSCQ020207-01) First Bid Section is located in Qianjiang Century City, Xiaoshan District, Hang-zhou, southeast to Yingfeng Road, southwest to Shixin North Road, north-west to Benjing Avenue, and northeast to Hongning Road. This is a large commercial

More >>
主图.png
09/ 24/ 2025

Gansu Tongwei-Dingxi Expressway

Corrugated Steel Box GirderSpan arrangement: 3×50=150m, 40+60+40=140mUnder Construction in 2022

More >>
主图.jpg
09/ 24/ 2025

Taizhou Yuhuan Dongfeng Cultural and Commercial Tourism Project

Taizhou Yuhuan Dongfeng Cultural and Commercial Tourism Project Phase I (NKM-0401 Plot) is located in Kanmen Street, Yuhuan, Taizhou, bor-dered by Jianzhou Road to the north, Haicheng Road to the south, Liudao Avenue to the west, and Zhenxing Road to the east, this project covers an area of 36,615.5

More >>
主图.png
09/ 24/ 2025

G25 Fuyang-G60 Zhuji Expressway Connection Line (Zhuji Section)

Hoisting ConstructionSpan Arrangement: 45+40=85m, 5×30=150m, 3×30=90mCompletion Year: 2020

More >>
主图.jpg
09/ 24/ 2025

G25 Fuyang-G60 Zhuji Expressway Link (Fuyang Section)

Hoisting ConstructionSpan: 55mCompletion Year: 2020

More >>
主图.jpg
09/ 24/ 2025

Annual Production of 200,000 Sets of Intelligent Logistics Equipment Electronic Integration

Annual Production of 200,000 Sets of Intelligent Logistics Equipment Electronic Integration, 15,000 Sets of Efficient Modern Logistics Integration System Equipment and Supporting Warehousing Logistics Project is located in the second phase of Ningbo Yinzhou Economic Development Zone, this project in

More >>
主图.jpg
09/ 24/ 2025

Wenrui Avenue South Section Expressway Phase I Project (Section 1), Zhejiang

Steel Box Girder + U-shaped GirderSpan Arrangement: 3×32m, 40m, 45m, 50m, 55mUnder Construction: 2022

More >>
主图.jpg
09/ 24/ 2025

Hebei (Ningbo) Home Co., Ltd. No. 1 Factory

Hebei (Ningbo) Home Co., Ltd. No. 1 Factory is located in Hangzhou BayNew Area, Ningbo City, this project is a large steel-structured factory buildingwith a single-story portal steel frame structure and partial mezzanine, cover-ing a building area of 82,137 square meters.

More >>
主图.jpg
09/ 24/ 2025

Lotus Global Headquarters Manufacturing Center Phase

Lotus Global Headquarters Manufacturing Center Phase I is located in the Smart Eco-city of Wuhan Economic and Technological Development Zone, Hubei Province, on plot 153R2, the steel structure comprises three buildings.The manufacturing center (Building 1) includes a podium and a tower withfour podi

More >>
主图.jpg
09/ 24/ 2025

Annual Production of 1,500 Sets of Public Safety Intelligent Security

Annual Production of 1,500 Sets of Public Safety Intelligent Security In-spection System Project is located in Tongxiang City, Jiaxing, Zhejiang Prov-ince, with a total building area of 166,990 square meters, comprising 4 steel-structured buildings. These are large logistics warehouses, each with th

More >>
主图.jpg
09/ 24/ 2025

Shengzhou Station Viaduct, Hangzhou-Shaoxing-Taizhou Railway, Zhejiang

Hoisting ConstructionSpan: 15.4mCompletion Year: 2020

More >>
主图.jpg
09/ 24/ 2025

Shanghai Wen Tian Xia Industrial Park Phase I Project

Shanghai Wen Tian Xia Industrial Park Phase I Project (Putuo District Future Island Phase III West Plot Project) is located in Putuo District, Shang-hai, this project comprises two buildings. Building 1 has 2 basement floors and 14 above-ground floors, reaching a height of 79.3 meters. It uses a cen

More >>
主图.png
09/ 24/ 2025

Ningbo Huamao International School International Library

Ningbo Huamao International School International Library is located on Maofeng Middle Road, Yinzhou District, Ningbo City, Zhejiang Province, with a construction scale of 258 million yuan. The project features innovativedesign, the steel structure floors are connected by steel rods, and a flow-er-sh

More >>
主图.png
09/ 24/ 2025

Hangzhou Land Reserve [2021] No. 8 Zhejiang Dongfulong Biotechnology Co., Ltd. Life Science Industrialization Base Project

Hangzhou Land Reserve [2021] No. 8 Zhejiang Dongfulong Biotechnology Co., Ltd. Life Science Industrialization Base Project is located in the Pharma-ceutical Port Town of Xiaoshan Economic Development Zone, Qiantang Dis-trict, Hangzhou, this project includes four multi-story steel-structured build-in

More >>
主图.png
09/ 24/ 2025

Zhejiang Daishan First People's Hospital Relocation Project

Zhejiang Daishan First People's Hospital Relocation Project is located in Daishan County, Zhoushan City, with a total investment of approximately 1,124 million yuan and a construction and installation budget of 880.3 million yuan. The project includes medical buildings for outpatient and emergency s

More >>
主图.jpg
09/ 24/ 2025

Longyou Health Industry Center Project

Longyou Health Industry Center Project is located in Longyou County, Quzhou City, Zhejiang Province, east of Youqin Road, south of Jixian Road, west of Wenjing Road, and north of Yong'an Road, . The Longyou Health In-dustry Center project is a medical building constructed to Grade III B hospital sta

More >>
主图.jpg
ABOUT US
We firmly believe that our Professional technical support, will help customers to boost their business with steady increase.

QUICK LINKS

CONTACT INFO
Tel: +86-13858138506
WhatsApp: +8613858138506
Add: Office 2610, Tower B, Xiaoshan Chamber of Commerce Building, No. 185 Jincheng Road, Xiaoshan, Hangzhou, Zhejiang, China 311202
CONTACT 
Copyright © 2024 Hangzhou Betrue Technology Co., Ltd Sitemap