01 Industry Challenges
The shipbuilding industry faces many challenges, such as Excess Orders, Insufficient Capacities, Under-Automated:
Low Production Efficiency
• Inconsistent welding performance — quality affected by environmental conditions.
• Inefficient for small batches & multiple variants — manual robot teaching slows production.
Skilled Welder Shortage
• High dependence on experienced welders — recruitment is challenging.
• Rising labor costs & workforce gap
Inconsistent Quality & Procedure
• Fluctuating yield & high rework rate — quality compliance is unstable.
• Difficult thermal deformation control — workpiece accuracy suffers.
• Limited adaptability of welding procedures.
To solve those challenges, we present BetrueTech Intelligent Welding Solution:

• Single-machine welding length: 15-20 m per hour
• Arc-on Time Ratio 75%
• DNV Certification: Single-pass fillet welds 6-8 mm
• Automatic Drawing Generation
• Welding Types Covered: horizontal/vertical fillet welding, wrap welding, and arc welding.
• Covers flat fillet welds, vertical fillet welds, wrap-around fillet welds, and curved welds.
• Applicable welding stages include pre-fabrication, flat panel assembly, and complex sub-assembly.
• Multi-Machine Task Allocation
Advantages of BetrueTech Intelligent Welding Solution( Data from a deployed project, for reference only.):
• Capacity Boost: Monthly production per unit area nearly doubles.
• Efficiency Gains: Robot achieves 75% arc-on time; welding time for the same workpiece reduced from 8 hours (manual) to 4 hours, doubling human-machine efficiency.
• Labor Optimization: Skilled welder recruitment replaced by operator recruitment; labor cost reduced from 8 welders to 1 operator, significantly cutting expenses.
• Quality Leap: Grinding volume reduced by 50% – 75%.
02 Application Cases
Customer: CSSC Tianjin
• Capacity doubled: Single machine output of 100 m to 120 m per shift and Arc-on Time Ratio of 75% to 80%.


Customer: China Merchants Jinling Shipyard Co., LTD
Customer: New Times Shipbuilding Co., LTD